Chemical Treatment

Delivering effective, environmentally friendly, cost-saving solutions to the oil industry

PetroFlow Solutions Pty Ltd  © 2010

Our goal is to apply our chemical products into the well perforations.  This will directly attack formation blockage by dispersing asphaltene and paraffin deposits, allowing the well to utilise its natural feed-in abilities and result in increased production.

 

Application Methods

 

Quite often we pump our chemical down-hole and follow with crude oil to ensure our products reach the perforations.

 

· Gas lift wells using tubing displacement

· Plunger Lift wells using tubing displacement

· Pumping wells using casing displacement and in the case of progressive cavity pumps without a check value using tubing displacement.

 

Application Quantities

 

A stimulation treatment is approximately 2 to 10 drums depending on the depth of the well and the down-hole configuration and well type. Depending on the well type and the amount of paraffin and asphaltene naturally flowing from the oil associated with the well we may recommend Continuous Injection to avoid the need for future stimulations.

Well Down-Hole Stimulations

Home

About Us

Contact Us

Services

Latest Projects

News

Links